长垣产业园区科技文献服务平台

期刊


ISSN0360-8352
刊名Computers & Industrial Engineering
参考译名计算机与工业工程
收藏年代1999~2023



全部

1999 2000 2001 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023

2008, vol.54, no.1 2008, vol.54, no.2 2008, vol.54, no.3 2008, vol.54, no.4 2008, vol.55, no.1 2008, vol.55, no.2
2008, vol.55, no.3 2008, vol.55, no.4

题名作者出版年年卷期
Performance estimation of an email contact center by a finite source discrete time Geo/Geo/1 queue with disastersF. Jolai; S. M. Asadzadeh; M. R. Taghizadeh20082008, vol.55, no.3
Order picking plan to maximize the order fill rateSuk-Chul Rim; In-Sun Park20082008, vol.55, no.3
An effective defect inspection system for polarized film images using image segmentation and template matching techniquesYoung-Geun Yoon; Seok-Lyong Lee; Chin-Wan Chung; Sang-Hee Kim20082008, vol.55, no.3
Single-machine scheduling with past-sequence-dependent setup times and time-dependent learning effectJi-Bo Wang20082008, vol.55, no.3
Ink flow control by multiple models in an offset lithographic printing processCristofer Englund; Antanas Verikas20082008, vol.55, no.3
Optimal solution for the two-dimensional facility layout problem using a branch-and-bound algorithmMaghsud Solimanpur; Amir Jafari20082008, vol.55, no.3
Effects of inventory policy on supply chain performance: A simulation study of critical decision parametersR. S. M. Lau; Jinxing Xie; Xiande Zhao20082008, vol.55, no.3
A decision framework for supplier rating and purchase allocation: A case in the semiconductor industryJing-Rung Yu; Chao-Chia Tsai20082008, vol.55, no.3
Capacity pricing mechanism for wafer fabricationShu-Hsing Chung; Amy H. I. Lee; Chun-Ying Huang; Chia-Chien Chuang20082008, vol.55, no.3
Beam search heuristics for the single machine early/tardy scheduling problem with no machine idle timeJorge M. S. Valente20082008, vol.55, no.3
12