长垣产业园区科技文献服务平台

期刊


ISSN0360-8352
刊名Computers & Industrial Engineering
参考译名计算机与工业工程
收藏年代1999~2023



全部

1999 2000 2001 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023

2008, vol.54, no.1 2008, vol.54, no.2 2008, vol.54, no.3 2008, vol.54, no.4 2008, vol.55, no.1 2008, vol.55, no.2
2008, vol.55, no.3 2008, vol.55, no.4

题名作者出版年年卷期
An evaluation of new heuristics for the location of cross-docks distribution centers in supply chain network designAnthony Ross; Vaidyanathan Jayaraman20082008, vol.55, no.1
Quality function deployment implementation based on Fuzzy Kano model: An application in PLM systemYu-Cheng Lee; Liang-Chyau Sheu; Yuan-Gan Tsou20082008, vol.55, no.1
Robust Design using Pareto type optimization: A genetic algorithm with arithmetic crossoverOnur Koksoy; Tankut Yalcinoz20082008, vol.55, no.1
The use of grey relational analysis in solving multiple attribute decision-making problemsYiyo Kuo; Taho Yang; Guan-Wei Huang20082008, vol.55, no.1
Supplier selection and supply quantity allocation of common and non-common parts with multiple criteria under multiple productsZ. H. Che; H. S. Wang20082008, vol.55, no.1
A Constructive Genetic Algorithm for permutation flowshop schedulingMarcelo Seido Nagano; Ruben Ruiz; Luiz Antonio Nogueira Lorena20082008, vol.55, no.1
Classification model for product form design using fuzzy support vector machinesMeng-Dar Shieh; Chih-Chieh Yang20082008, vol.55, no.1
A two-stage-priority-rule-based algorithm for robust resource-constrained project schedulingHedi Chtourou; Mohamed Haouari20082008, vol.55, no.1
A simulation-based heuristic algorithm for disposition of direction findersHo-Joo Lee; Yeong-Dae Kim; Sang-Beom Lee20082008, vol.55, no.1
A comparative study of heuristic algorithms on Economic Lot Scheduling ProblemAsif S. Raza; Ali Akgunduz20082008, vol.55, no.1
12