长垣产业园区科技文献服务平台

期刊


ISSN0360-8352
刊名Computers & Industrial Engineering
参考译名计算机与工业工程
收藏年代1999~2023



全部

1999 2000 2001 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023

2008, vol.54, no.1 2008, vol.54, no.2 2008, vol.54, no.3 2008, vol.54, no.4 2008, vol.55, no.1 2008, vol.55, no.2
2008, vol.55, no.3 2008, vol.55, no.4

题名作者出版年年卷期
The optimization of printed circuit board manufacturing by improving the drilling process productivityMircea Ancau20082008, vol.55, no.2
Heuristics for an industrial car sequencing problem considering paint and assembly shop objectivesAlexandre Joly; Yannick Frein20082008, vol.55, no.2
Reverse engineering of a symmetric objectMinho Chang; Sang C. Park20082008, vol.55, no.2
Order-batching methods for an order-picking warehouse with two cross aislesYing-Chin Ho; Teng-Sheng Su; Zhi-Bin Shi20082008, vol.55, no.2
Decentralized supply chain planning framework for third party logistics partnershipHosang Jung; F. Frank Chen; Bongju Jeong20082008, vol.55, no.2
4/R/I/T distribution logistics network 0-1 programming model and applicationWang Zhuan; Zhang Qinghua; Yang bo; He Wenwen20082008, vol.55, no.2
Evaluation of the throughput of a multiple-picker order picking system with congestion considerationJason Chao-Hsien Pan; Po-Hsun Shih20082008, vol.55, no.2
Two-echelon supply chain games in a fuzzy environmentChenxi Zhou; Ruiqing Zhao; Wansheng Tang20082008, vol.55, no.2
Outsourcer selection and order tracking in a supply chain by mobile agentsChi-Bin Cheng; Che Wang20082008, vol.55, no.2
A fuzzy-neural and multiple-bucket approach for estimating lot cycle time in a wafer fab with dynamic product mixToly Chen20082008, vol.55, no.2
12