长垣产业园区科技文献服务平台

期刊


ISSN0360-8352
刊名Computers & Industrial Engineering
参考译名计算机与工业工程
收藏年代1999~2023



全部

1999 2000 2001 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023

2014, vol.67 2014, vol.68 2014, vol.69 2014, vol.70 2014, vol.71 2014, vol.72
2014, vol.73 2014, vol.74 2014, vol.75 2014, vol.76 2014, vol.77 2014, vol.78
2014, vol.78, no.

题名作者出版年年卷期
A dynamic programming based heuristic for locating stops in public transportation networksOtto, Benjamin; Boysen, Nils20142014, vol.78, no.
Optimization of variable demand fuzzy economic order quantity inventory models without and with backorderingSamal, N. K.; Pratihar, D. K.20142014, vol.78, no.
Integrating tactical and operational berth allocation decisions via Simulation-OptimizationLegato, Pasquale; Mazza, Rina Mary; Gulli, Daniel20142014, vol.78, no.
A tabu search algorithm for the job shop problem with sequence dependent setup timesShen, Liji20142014, vol.78, no.
Supply network design: Risk-averse or risk-neutral?Madadi, AliReza; Kurz, Mary E.; Taaffe, Kevin M.; Sharp, Julia L.; Mason, Scott J.20142014, vol.78, no.
Two-agent single-machine scheduling to minimize the weighted sum of the agents' objective functionsCheng, T. C. E.; Liu, Chih-Yu; Lee, Wen-Chiung; Ji, M.20142014, vol.78, no.
Patient flow modelling and performance analysis of healthcare delivery processes in hospitals: A review and reflectionsBhattacharjee, Papiya; Ray, Pradip Kumar20142014, vol.78, no.
Individually and socially optimal joining rules for an egalitarian processor-sharing queue under different information scenariosTang, Yinghui; Wu, Wenqing; Yu, Miaomiao20142014, vol.78, no.
Note on the sequence dependent setup scheduling problem (SDSSP) with earliness and tardiness penaltiesAnderson, Bradley E.20142014, vol.78, no.
An economically designed Sequential Probability Ratio Test control chart for short-run productionZhang, Pengwei; Su, Qin; Li, Chenglong; Wang, Tiantian20142014, vol.78, no.
12345678910...