长垣产业园区科技文献服务平台

期刊


ISSN0360-8352
刊名Computers & Industrial Engineering
参考译名计算机与工业工程
收藏年代1999~2023



全部

1999 2000 2001 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023

2005, vol.48, no.1 2005, vol.48, no.2 2005, vol.48, no.3 2005, vol.48, no.4 2005, vol.49, no.1 2005, vol.49, no.2
2005, vol.49, no.3 2005, vol.49, no.4

题名作者出版年年卷期
Selecting the best statistical distribution - a comment and a suggestion on multi-criterion evaluationRamakrishnan Ramanathan20052005, vol.49, no.4
A comparison of solution procedures for two-machine flow shop scheduling with late work criterionJacek Blazewicz; Erwin Pesch; Malgorzata Sterna; Frank Werner20052005, vol.49, no.4
A stochastic model for the analysis of a two-machine flexible manufacturing cellMajid M. Aldaihani; Mehmet Savsar20052005, vol.49, no.4
Bayesian judgment of a dichotomous inspection system when the true state of an evaluated item is unknownRoberto da Costa Quinino; Linda Lee Ho; Anderson L. G. Trindade20052005, vol.49, no.4
A distributed time-driven simulation method for enabling real-time manufacturing shop floor controlSohyung Cho20052005, vol.49, no.4
Optimization of a multi-response problem in Taguchi's dynamic systemKun-Lin Hsieh; Lee-Ing Tong; Hung-Pin Chiu; Hsin-Ya Yeh20052005, vol.49, no.4
State space representation of routing flexibilityLeonardo Rosa Rohde; Denis Borenstein20052005, vol.49, no.4
Minimizing makespan in a two-stage system with flowshop and open shopLing-Huey Su; Fuh-Der Chou; Wei-Ching Ting20052005, vol.49, no.4
Design of practical optimum JIT systems by integration of computer simulation and analysis of varianceA. Azadeh; B. Bidokhti; S. M. R. Sakkaki20052005, vol.49, no.4
Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobsS. Thiagarajan; Chandrasekharan Rajendran20052005, vol.49, no.4
123456789