长垣产业园区科技文献服务平台

期刊


ISSN0360-8352
刊名Computers & Industrial Engineering
参考译名计算机与工业工程
收藏年代1999~2023



全部

1999 2000 2001 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023

2004, vol.46, no.1 2004, vol.46, no.2 2004, vol.46, no.3 2004, vol.46, no.4 2004, vol.47, no.1 2004, vol.47, no.2-3
2004, vol.47, no.4

题名作者出版年年卷期
Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraintsH. Allaoui; A. Artiba20042004, vol.47, no.4
Operations planning for collect-and-place machines in PCB assemblyMartin Grunow; Hans-Otto Gunther; Martin Schleusener; Ihsan Onur Yilmaz20042004, vol.47, no.4
A genetic algorithm based approach to the mixed-model assembly line balancing problem of type IIAna Sofia Simaria; Pedro M. Vilarinho20042004, vol.47, no.4
Selecting the appropriate input data set when configuring a permanent workforceJonathan F. Bard20042004, vol.47, no.4
Testing process performance based on capability index C{sub}(Pk) with critical valuesW. L. Pearn; P. C. Lin20042004, vol.47, no.4
Joint pricing and ordering policy for a deteriorating inventoryS. Mukhopadhyay; R. N. Mukherjee; K. S. Chaudhuri20042004, vol.47, no.4
A Markovian inventory system with random shelf time and back ordersSrinivas R. Chakravarthy; Jacob K. Daniel20042004, vol.47, no.4
The virtual company: a re-configurable open shell for problem-based learning in industrial engineeringH. Y. K. Lau; K. L. Mak20042004, vol.47, no.2-3
Earliness/tardiness scheduling with a common due date and family setupsRasika H. Suriyaarachchi; Andrew Wirth20042004, vol.47, no.2-3
An evolutionary algorithm for manufacturing cell formationJose Fernando Gongalves; Mauricio G. C. Resende20042004, vol.47, no.2-3
12345678910