长垣产业园区科技文献服务平台

期刊


ISSN0360-8352
刊名Computers & Industrial Engineering
参考译名计算机与工业工程
收藏年代1999~2023



全部

1999 2000 2001 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023

2004, vol.46, no.1 2004, vol.46, no.2 2004, vol.46, no.3 2004, vol.46, no.4 2004, vol.47, no.1 2004, vol.47, no.2-3
2004, vol.47, no.4

题名作者出版年年卷期
An integrated agent-based approach for responsive control of manufacturing resourcesM. K. Lim; D. Z. Zhang20042004, vol.46, no.2
A performance estimation model for AS/RS by M/G/1 queuing systemSun Hur; Young Hae Lee; Si Yeong Lim; Moon Hwan Lee20042004, vol.46, no.2
Estimating design effort for GE hydro projectsHamdi A. Bashir; Vince Thomson20042004, vol.46, no.2
Impact of forecasting error on the performance of capacitated multi-item production systemsJinxing Xie; T. S. Lee; Xiande Zhao20042004, vol.46, no.2
Modeling and simulation of product's surface designLi Wenfeng; Wu Zhenyu; Chen Dingfang20042004, vol.46, no.2
An operator load-balancing problem in a semi-automatic parallel machine shopDug Hee Moon; Dae Kyoung Kim; Jong Yun Jung20042004, vol.46, no.2
Multiple objective-integrated methodology of global optimum decision-making on mineral resources exploitationWei-Xuan Xu; Yi-Ming Wei20042004, vol.46, no.2
Application of VaR methodology to risk management in the stock market in ChinaYing Fan; Yi-Ming Wei; Wei-Xuan Xu20042004, vol.46, no.2
Operator-scheduling using a constraint satisfaction technique in port container terminalsKap Hwan Kim; Kyeong Woo Kim; Hark Hwang; Chang Seong Ko20042004, vol.46, no.2
A vision-based system for automatic growing ring detection and measurementC. Vaz; P. Carvalho; F. Duarte; A. Dourado20042004, vol.46, no.2
123