长垣产业园区科技文献服务平台

期刊


ISSN0360-8352
刊名Computers & Industrial Engineering
参考译名计算机与工业工程
收藏年代1999~2023



全部

1999 2000 2001 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023

2014, vol.67 2014, vol.68 2014, vol.69 2014, vol.70 2014, vol.71 2014, vol.72
2014, vol.73 2014, vol.74 2014, vol.75 2014, vol.76 2014, vol.77 2014, vol.78
2014, vol.78, no.

题名作者出版年年卷期
Special issue: IE in healthcareGauthier, Francois20142014, vol.78, no.
Modeling risk in a Design for Supply Chain problemClaypool, Erin; Norman, Bryan A.; Needy, Kim LaScola20142014, vol.78, no.
Scheduling jobs with ready times and precedence constraints on parallel batch machines using metaheuristicsBilyk, Andrew; Moench, Lars; Almeder, Christian20142014, vol.78, no.
Heuristic for the two-dimensional arbitrary stock-size cutting stock problemCui, Yaodong; Cui, Yi-Ping; Yang, Liu20142014, vol.78, no.
The planning and scheduling of operating rooms: A simulation approachM'Hallah, R.; Al-Roomi, A. H.20142014, vol.78, no.
A robust model for multi-floor layout problemIzadinia, Niloufar; Eshghi, Kourosh; Salmani, Mohammad Hassan20142014, vol.78, no.
Cost and revenue efficiency in DEA-R modelsMozaffari, M. R.; Kamyab, P.; Jablonsky, J.; Gerami, J.20142014, vol.78, no.
Evaluating the risk of healthcare failure modes using interval 2-tuple hybrid weighted distance measureLiu, Hu-Chen; You, Jian-Xin; You, Xiao-Yue20142014, vol.78, no.
Single-machine due-window assignment and scheduling with resource allocation, aging effect, and a deteriorating rate-modifying activity (vol 66, pg 952, 2013)Cheng, Bo; Cheng, Ling20142014, vol.78, no.
A new flexible and reliable interval valued fuzzy VIKOR method based on uncertainty risk reduction in decision making process: An application for determining a suitable location for digging some pits for municipal wet waste landfillSadi-nezhad, S.; Makui, A.; Mokhtarian, M. N.20142014, vol.78, no.
123