长垣产业园区科技文献服务平台

期刊


ISSN0360-8352
刊名Computers & Industrial Engineering
参考译名计算机与工业工程
收藏年代1999~2023



全部

1999 2000 2001 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023

2008, vol.54, no.1 2008, vol.54, no.2 2008, vol.54, no.3 2008, vol.54, no.4 2008, vol.55, no.1 2008, vol.55, no.2
2008, vol.55, no.3 2008, vol.55, no.4

题名作者出版年年卷期
Univariate modeling and forecasting of monthly energy demand time series using abductive and neural networksR. E. Abdel-Aal20082008, vol.54, no.4
Multiple-objective genetic optimization of the spatial design for packing and distribution carton boxesS. Y. S. Leung; W. K. Wong; P. Y. Mok20082008, vol.54, no.4
Neural network-based simulation metamodels for predicting probability distributionsChristopher W. Zobel; Kellie B. Keeling20082008, vol.54, no.4
A multiple stakeholders5 approach to strategic selection decisionsS. M. Ali Khatami Firouzabadi; Brian Henson; Cathy Barnes20082008, vol.54, no.4
Integrated process planning and scheduling in a supply chainChiung Moon; Young Hae Lee; Chan Seok Jeong; YoungSu Yun20082008, vol.54, no.4
Setup times and fast tracking in resource-constrained project schedulingMario Vanhoucke20082008, vol.54, no.4
Decomposition heuristic to minimize total cost in a multi-level supply chain networkByung Ki Lee; Kyung Hwan Kang; Young Hoon Lee20082008, vol.54, no.4
Multi-period lot-sizing with supplier selection using achievement scalarizing functionsOzden Ustun; Ezgi Aktar Demirtas20082008, vol.54, no.4
Some scheduling problems with deteriorating jobs and learning effectsT. C. E. Cheng; Chin-Chia Wu; Wen-Chiung Lee20082008, vol.54, no.4
Makespan minimization for multiple uniform machinesChien-Hung Lin; Ching-Jong Liao20082008, vol.54, no.4
123