长垣产业园区科技文献服务平台

期刊


ISSN0360-8352
刊名Computers & Industrial Engineering
参考译名计算机与工业工程
收藏年代1999~2023



全部

1999 2000 2001 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023

2013, vol.64, no.1 2013, vol.64, no.2 2013, vol.64, no.3 2013, vol.64, no.4 2013, vol.65, no.1 2013, vol.65, no.2
2013, vol.65, no.3 2013, vol.65, no.4 2013, vol.66, no.1 2013, vol.66, no.2 2013, vol.66, no.3 2013, vol.66, no.4

题名作者出版年年卷期
A fuzzy group data envelopment analysis model for high-technology project selection: A case study at NASAMadjid Tavana; Kaveh Khalili-Damghani; Soheil Sadi-Nezhad20132013, vol.66, no.1
Prioritized multi-criteria decision making based on preference relationsXiaohan Yu; Zeshui Xu; Shousheng Liu20132013, vol.66, no.1
Customer-oriented school bus operations for childcare centers in KoreaSeung-Min Song; Taeho Kim20132013, vol.66, no.1
Optimization-based posture reconstruction for digital human modelsJared Gragg; Aimee Cloutier; James Yang20132013, vol.66, no.1
A multi-stage joint economic lot size model with lead time penalty costsTaebok Kim; Christoph H. Glock20132013, vol.66, no.1
Maximum expert consensus models with linear cost function and aggregation operatorsBowen Zhang; Yucheng Dong; Yinfeng Xu20132013, vol.66, no.1
Iterative approaches for solving a multi-objective 2-dimensional vector packing problemNadia Dahmani; Francois Clautiaux; Saoussen Krichen; El-Ghazali Talbi20132013, vol.66, no.1
Mixed integer programming for minimizing the period of a cycic railway timetable for a single track with two train typesMojtaba Heydar; Matthew E. H. Petering; Dietrich R. Bergmann20132013, vol.66, no.1
On the identical parallel-machine rescheduling with job rework disruptionLe Liu; Hong Zhou20132013, vol.66, no.1
Performance analysis of an M/G/1 queueing system under Bernoulli vacation schedules with server setup and close down periodsB. Krishna Kumar; R. Rukmani; S. R. Anantha Lakshmi20132013, vol.66, no.1
12