长垣产业园区科技文献服务平台

期刊


ISSN0360-8352
刊名Computers & Industrial Engineering
参考译名计算机与工业工程
收藏年代1999~2023



全部

1999 2000 2001 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023

2013, vol.64, no.1 2013, vol.64, no.2 2013, vol.64, no.3 2013, vol.64, no.4 2013, vol.65, no.1 2013, vol.65, no.2
2013, vol.65, no.3 2013, vol.65, no.4 2013, vol.66, no.1 2013, vol.66, no.2 2013, vol.66, no.3 2013, vol.66, no.4

题名作者出版年年卷期
Multiple agents maximum collection problem with time dependent rewardsAli Ekici; Anand Retharekar20132013, vol.64, no.4
Selection of efficient portfolios-probabilistic and fuzzy approach, comparative studyBogdan Rebiasz20132013, vol.64, no.4
A simulation based supply partner selection decision support tool for service provision in DellP. J. Byrne; Cathal Heavey; Paul Blake; Paul Liston20132013, vol.64, no.4
A decision support system for fuzzy multi-objective multi-period sustainable project selectionKaveh Khalili-Damghani; Soheil Sadi-Nezhad20132013, vol.64, no.4
A replacement schedule model for airborne service helicoptersChing-Hui Tang20132013, vol.64, no.4
Modeling clustered non-stationary Poisson processes for stochastic simulation inputsIssac Shams; Saeede Ajorlou; Kai Yang20132013, vol.64, no.4
An integrated algorithm for cutting stock problems in the thin-film transistor liquid crystal display industryHao-Chun Lu; Yao-Huei Huang; Kuo-An Tseng20132013, vol.64, no.4
Short Communication The three-stage ordered flow shop problem with flexible stage orderingS. S. Panwalkar; Christos Koulamas20132013, vol.64, no.4
Hub location problems: A review of models, classification, solution techniques, and applicationsReza Zanjirani Farahani; Masoud Hekmatfar; Alireza Boloori Arabani; Ehsan Nikbakhsh20132013, vol.64, no.4
A multi-objective programming approach, integrated into the TOPSIS method, in order to optimize product design; in three-dimensional concurrent engineeringH. Shidpour; M. Shahrokhi; A. Bernard20132013, vol.64, no.4
12