长垣产业园区科技文献服务平台

期刊


ISSN0360-8352
刊名Computers & Industrial Engineering
参考译名计算机与工业工程
收藏年代1999~2023



全部

1999 2000 2001 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023

2016, vol.100 2016, vol.101 2016, vol.102 2016, vol.91 2016, vol.92 2016, vol.93
2016, vol.94 2016, vol.95 2016, vol.96 2016, vol.97 2016, vol.98 2016, vol.99

题名作者出版年年卷期
A robust bi-objective model for concurrent planning of project scheduling and material procurementTabrizi, Babak H.; Ghaderi, Seyed Farid20162016, vol.98
Overhaul planning and exchange scheduling for maintenance services with rotable inventory and limited processing capacityErkoc, Murat; Ertogral, Kadir20162016, vol.98
Resource-constrained unrelated parallel machine scheduling problem with sequence dependent setup times, precedence constraints and machine eligibility restrictionsAfzalirad, Mojtaba; Rezaeian, Javad20162016, vol.98
A PSO algorithm for multi-objective hull assembly line balancing using the stratified optimization strategyYuguang, Zhong; Bo, Ai; Yong, Zhan20162016, vol.98
A robust heuristic method on the clustering-assignment problem modelChuang, Yi-Fei; Lee, Hsu-Tung; Tan, Shih-Wei20162016, vol.98
Optimal maintenance-replacement policy of products with competing failures after expiry of the warrantyShang, Lijun; Si, Shubin; Cai, Zhiqiang20162016, vol.98
Model-based delivery cost approximation in attended home servicesBuehler, Dominic; Klein, Robert; Neugebauer, Michael20162016, vol.98
Breakout dynasearch for the single-machine total weighted tardiness problemDing, Junwen; Lu, Zhipeng; Cheng, T. C. E.; Xu, Liping20162016, vol.98
A multi-criteria approach to robust outsourcing decision-making in stochastic manufacturing systemsHahn, Gerd J.; Sens, Torben; Decouttere, Catherine; Vandaele, Nico J.20162016, vol.98
Phase II profile monitoring based on proportional odds modelsHuwang, Longcheen; Wang, Yi-Hua Tina; Yeh, Arthur B.; Huang, Yi-Heng20162016, vol.98
12345