长垣产业园区科技文献服务平台

期刊


ISSN0360-8352
刊名Computers & Industrial Engineering
参考译名计算机与工业工程
收藏年代1999~2023



全部

1999 2000 2001 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023

2010, vol.58, no.1 2010, vol.58, no.2 2010, vol.58, no.3 2010, vol.58, no.4 2010, vol.59, no.1 2010, vol.59, no.2
2010, vol.59, no.3 2010, vol.59, no.4

题名作者出版年年卷期
Analysis of robustness in proactive scheduling: A graphical approachFeiza Ghezail; Henri Pierreval; Sonia Hajri-Gabouj20102010, vol.58, no.2
A survey of scheduling with deterministic machine availability constraintsYing Ma; Chengbin Chu; Chunrong Zuo20102010, vol.58, no.2
Scheduling an operating theatre under human resource constraintsB. Roland; C. Di Martinelly; F. Riane; Y. Pochet20102010, vol.58, no.2
A planning and scheduling problem for an operating theatre using an open scheduling strategyH. Fei; N. Meskens; C. Chu20102010, vol.58, no.2
Operating theatre scheduling with patient recovery in both operating rooms and recovery bedsVincent Augusto; Xiaolan Xie; Viviana Perdomo20102010, vol.58, no.2
Steelmaking and refining coordinated scheduling problem with waiting time and transportation considerationLixin Tang; Jing Guan; Guofen Hu20102010, vol.58, no.2
Training a neural network to select dispatching rules in real timeWiem Mouelhi-Chibani; Henri Pierreval20102010, vol.58, no.2
Series production in a basic re-entrant shop to minimize makespan or total flow timeFeng Chu; Chengbin Chu; Caroline Desprez20102010, vol.58, no.2
An integrated fuzzy multi-criteria approach for the performance evaluation of multiple manufacturing plantsVincent F. Yu; Kuo-Jen Hu20102010, vol.58, no.2
An analytic hierarchy process approach with linguistic variables for selection of an R&D strategic alliance partnerSheu Hua Chen; Pei Wen Wang; Chien Min Chen; Hong Tau Lee20102010, vol.58, no.2
12