长垣产业园区科技文献服务平台

期刊


ISSN0360-8352
刊名Computers & Industrial Engineering
参考译名计算机与工业工程
收藏年代1999~2023



全部

1999 2000 2001 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023

2009, vol.56, no.1 2009, vol.56, no.2 2009, vol.56, no.3 2009, vol.56, no.4 2009, vol.57, no.1 2009, vol.57, no.2
2009, vol.57, no.3 2009, vol.57, no.4

题名作者出版年年卷期
Automated process planning method to machine A B-Spline free-form feature on a mill-turn centerNikhil Date; Prakash Krishnaswami; V. V. Satish K. Motipalli20092009, vol.56, no.1
Minimizing the normalized sum of square for workload deviations on m parallel processorsJohnny C. Ho; Tzu-Liang (Bill) Tseng; Alex J. Ruiz-Torres; Francisco J. Lopez20092009, vol.56, no.1
A two-warehouse inventory model with imperfect quality production processesKun-Jen Chung; Chao-Chun Her; Shy-Der Lin20092009, vol.56, no.1
Retailer's optimal ordering and discounting policies under advance sales discount and trade creditsYu-Chung Tsao20092009, vol.56, no.1
A discrete particle swarm optimization algorithm for scheduling parallel machinesAli Husseinzadeh Kashan; Behrooz Karimi20092009, vol.56, no.1
An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container portsR. Tavakkoli-Moghaddam; A. Makui; S. Salahi; M. Bazzazi; F. Taheri20092009, vol.56, no.1
A practical methodology for realizing product service systems for consumer productsXiaoyu Yang; Philip Moore; Jun-Sheng Pu; Chi-Biu Wong20092009, vol.56, no.1
Overall availability of a robot with internal safety deviceEdmond J. Vanderperre; Stanislav S. Makhanov20092009, vol.56, no.1
Multi-criteria sequence-dependent job shop scheduling using genetic algorithmsAndrew Manikas; Yih-Long Chang20092009, vol.56, no.1
On the convergence of a new time window discretization method for the traveling salesman problem with time window constraintsXiubin Wang; Amelia C. Regan20092009, vol.56, no.1
123456