题名作者出版年年卷期
An adaptive branch and bound approach for transforming job shops into flow shopsJose M. Framinan20072007, vol.52, no.1
Heuristic procedures for reactive project schedulingStijn Van de Vender; Francisco Ballestin; Erik Demeulemeester; Willy Herroelen20072007, vol.52, no.1
Inventory and pricing strategies for deteriorating items with shortages: a discounted cash flow approachChung-Yuan Dye; Liang-Yuh Ouyang; Tsu-Pang Hsieh20072007, vol.52, no.1
Job scheduling to minimize the weighted waiting time variance of jobsXueping Li; Nong Ye; Tieming Liu; Yang Sun20072007, vol.52, no.1
Satisfying due-dates in the presence of sequence dependent family setups with a special comedown structureMehmet R. Taner; Thom J. Hodgson; Russell E. King; Scott R. Schultz20072007, vol.52, no.1
Finding the most efficient DMUs in DEA: an improved integrated modelGholam R. Amin; M. Toloo20072007, vol.52, no.1
Lot sizing with permissible delay in payments and entropy costMohamad Y. Jaber20072007, vol.52, no.1
Dispatching in flowshops with bottleneck machinesChandrasekharan Rajendran; Knut Alicke20072007, vol.52, no.1
Single-vendor single-buyer with integrated transport-inventory system: models and heuristics in the case of perishable goodsSimone Zanoni; Lucio Zavanella20072007, vol.52, no.1
Heuristic algorithms for solving the maximum lateness scheduling problem with learning considerationsChin-Chia Wu; Wen-Chiung Lee; Tsung Chen20072007, vol.52, no.1