长垣产业园区科技文献服务平台

期刊


ISSN0360-8352
刊名Computers & Industrial Engineering
参考译名计算机与工业工程
收藏年代1999~2023



全部

1999 2000 2001 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023

2006, vol.50, no.1-2 2006, vol.50, no.3 2006, vol.50, no.4 2006, vol.51, no.1 2006, vol.51, no.2 2006, vol.51, no.3
2006, vol.51, no.4

题名作者出版年年卷期
Block approach - tabu search algorithm for single machine total weighted tardiness problemWojciech Bozejko; Jozef Grabowski; Mieczyslaw Wodecki20062006, vol.50, no.1-2
A review of optimization techniques in metal cutting processesIndrajit Mukherjee; Pradip Kumar Ray20062006, vol.50, no.1-2
Evaluation of connection types in design for disassembly (DFD) using analytic network processAskiner Gungor20062006, vol.50, no.1-2
A multi-mode resource-constrained scheduling problem in the context of port operationsLuciano Lessa Lorenzoni; Hannu Ahonen; Arlindo Gomes de Alvarenga20062006, vol.50, no.1-2
A learning algorithm based estimation method for maintenance cost of product conceptsKwang-Kyu Seo; Beum Jun Ahn20062006, vol.50, no.1-2
Heuristic lot size scheduling on unrelated parallel machines with applications in the textile industryCristovao Silva; Jose M. Magalhaes20062006, vol.50, no.1-2
Design of hierarchical fuzzy model for classification problem using GAsNai Ren Guo; Tzuu-Hseng S. Li; Chao-Lin Kuo20062006, vol.50, no.1-2
A simulated annealing approach to a bi-criteria sequencing problem in a two-stage supply chainS. Afshin Mansouri20062006, vol.50, no.1-2
Simple algorithms for updating multi-resource allocations in an unreliable flow networkChung-Chi Hsieh; Ming-Hsien Lin20062006, vol.50, no.1-2
Reliability of grid service systemsY. S. Dai; M. Xie; K. L. Poh20062006, vol.50, no.1-2
12