长垣产业园区科技文献服务平台

期刊


ISSN0095-8948
刊名Engineering & Mining Journal
参考译名工程与采矿杂志
收藏年代1988~2007



全部

1988 1998 2005 2006 2007

2006, vol.207, no.1 2006, vol.207, no.10 2006, vol.207, no.2 2006, vol.207, no.3 2006, vol.207, no.4 2006, vol.207, no.5
2006, vol.207, no.6 2006, vol.207, no.7 2006, vol.207, no.8 2006, vol.207, no.9

题名作者出版年年卷期
M&A Scuffling Reaches New PeakSteve Fiscor20062006, vol.207, no.5
Agnico-Eagle Starts LaRonde II ConstructionSteve Fiscor20062006, vol.207, no.5
Falconbridge Studying Expanded South American Copper ProductionSteve Fiscor20062006, vol.207, no.5
First Quantum Acquires AdastraSteve Fiscor20062006, vol.207, no.5
Antofagasta Wins Tethyan BiddingSteve Fiscor20062006, vol.207, no.5
Darby Explosion Pushes U.S. Coal Fatalities Higher, MSHA Places Moratorium on SealsSteve Fiscor20062006, vol.207, no.5
The Color of SafetyRussell A. Carter20062006, vol.207, no.5
Command and Control: LHD automation systems offer progressive levels of operator-assisted or autonomous operation for mines interested in hands-off haulageSteve Fiscor20062006, vol.207, no.5
Driving Mining UndergroundDoug Morrison20062006, vol.207, no.5
Digital-Control Updates Let Old Shovels Give New Models a Run for Their MoneyMark R. Duskey20062006, vol.207, no.5
12