长垣产业园区科技文献服务平台

期刊


ISSN0951-192X
刊名International Journal of Computer Integrated Manufacturing
参考译名国际计算机集成制造杂志
收藏年代1998~2023



全部

1998 1999 2000 2001 2002 2003
2004 2005 2006 2007 2008 2009
2010 2011 2012 2013 2014 2015
2016 2017 2018 2019 2020 2021
2022 2023

2015, vol.28, no.1/3 2015, vol.28, no.10/12 2015, vol.28, no.4/6 2015, vol.28, no.7/9

题名作者出版年年卷期
Layout of robot cells based on kinematic constraintsTubaileh, Allan S.20152015, vol.28, no.10/12
Early problems identification in collaborative engineering with different product data modelling standardsJovanovica, V. M.; Ma, L.; Tomovic, M. M.; Guerra-Zubiaga, D. A.20152015, vol.28, no.10/12
An integrated top-down design process evaluation approach of complex products and systems based on hierarchical design structure matrixHuang, Jiaqi; Li, Yupeng; Chu, Xuening; Chu, Dexin20152015, vol.28, no.10/12
Feature-based modelling and process parameters selection in a CAPP system for prismatic micro partsKumar, S. P. Leo; Jerald, J.; Kumanan, S.20152015, vol.28, no.10/12
A nested partitioning-based approach to integrate process planning and scheduling in flexible manufacturing environmentMohapatra, P.; Kumar, N.; Matta, Andrea; Tiwari, M. K.20152015, vol.28, no.10/12
A chemotaxis-enhanced bacterial foraging algorithm and its application in job shop scheduling problemZhao, Fuqing; Jiang, Xin; Zhang, Chuck; Wang, Junbiao20152015, vol.28, no.10/12
A new product service system concept evaluation approach based on Information Axiom in a fuzzy-stochastic environmentChen, Dongping; Chu, Xuening; Sun, Xiwu; Li, Yupeng20152015, vol.28, no.10/12
Computer-based management of interactive data transformation systems using Taguchi's robust parameter designLuangpaiboon, Pongchanun; Chinda, Keerati20152015, vol.28, no.10/12
A hybrid service supplier selection approach based on variable precision rough set and VIKOR for developing product service systemLiu, Qinming; Geng, Xiuli20152015, vol.28, no.10/12
Flexible flowline scheduling problem with constraints for the beginning and terminating time of processing of jobs at stagesGohari, Sheida; Salmasi, Nasser20152015, vol.28, no.10/12
123