长垣产业园区科技文献服务平台

期刊


ISSN0141-4615
刊名Rail Engineering International
参考译名国际铁道工程
收藏年代2000~2022



全部

2000 2001 2002 2003 2004 2005
2006 2007 2008 2009 2010 2011
2012 2013 2014 2015 2016 2017
2018 2019 2020 2021 2022

2006, vol.35, no.1 2006, vol.35, no.2 2006, vol.35, no.3 2006, vol.35, no.4

题名作者出版年年卷期
Installation, renewal and maintenance of overhead catenary systems by means of a specially designed catenary installation and renewal machineManfred Irsigler; Johann Kohel20062006, vol.35, no.4
Pandrol VIPA-SP track support system for the Leven Bridge in Cumbria, EnglandChris Morison20062006, vol.35, no.4
The ROBEL Mobile Maintenance Composition for increased worksite safetyWilhelmina M. de Rooi20062006, vol.35, no.4
Evaluation of rail grinding strategies by means of LCC analysisThomas Hempe; Thomas Siefer20062006, vol.35, no.3
The Matisa B 66 UC high-performance continuous action universal tamping machineCaroline Roulin; Area Sales; Product Manager20062006, vol.35, no.3
The reform of Greek State Railways (OSE) and the impact on track maintenanceNikolaos Demiridis; Christos Pyrgidis20062006, vol.35, no.2
New Voith Turbo transmissions and drive systems for rail vehiclesE. M. Choueiri20062006, vol.35, no.2
The Voith Maxima 40 CC six-axle diesel-hydraulic locomotiveE. M. Choueiri20062006, vol.35, no.2
Examples of BEST applications for the training of interlocking operatorsE. M. Choueiri20062006, vol.35, no.2
Simulator-aided data preparation for interlocking planning using BESTNorbert Bolln; Peter Erno Szilva20062006, vol.35, no.2
12