长垣产业园区科技文献服务平台

期刊


ISSN0317-0926
刊名CIM Bulletin
参考译名加拿大矿业学会通报
收藏年代1998~2006

关联期刊参考译名收藏年代
CIM Magazine加拿大矿业学会杂志2006~2007


全部

1998 1999 2000 2001 2002 2003
2004 2005 2006

1999, vol.92, no.1026 1999, vol.92, no.1027 1999, vol.92, no.1028 1999, vol.92, no.1029 1999, vol.92, no.1030 1999, vol.92, no.1031
1999, vol.92, no.1032 1999, vol.92, no.1033 1999, vol.92, no.1034 1999, vol.92, no.1035

题名作者出版年年卷期
Estimation of large open pit haulage truck requirementsG. H. Blackwell19991999, vol.92, no.1028
Liability transfer agreements for the funding of mine closures using Monte Carlo simulationsD. R. Anderson; D. A. Orava; N. C. Garisto; M. Donahue19991999, vol.92, no.1028
Process control- and where are we going?B. Flintoff19991999, vol.92, no.1028
Resin-grouted cable supports for coal mine ground controlS. C. Tadolini; J. L. Gallagher; J. M. Goris19991999, vol.92, no.1028
Tailings dam failures need not be disasters- the thickened tailings disposal (TTD) systemE. I. Robinsky19991999, vol.92, no.1028
The future of extractive metallurgyF. Habashi19991999, vol.92, no.1028